- Contact Person : Ms. Zheng Lisa
- Company Name : Changzhou Success Building Material Machinery Co., Ltd.
- Tel : 86-519-13775230604
- Fax : 86-519-89883760
- Address : Jiangsu,Changzhou,No.170 West Hanjiang Road,Xinbei District
- Country/Region : China
Best Material Autoclave Trolley For AAC Plant
Feature
The Autoclave Trolley Transport Mould with "Cake" into Autoclave
Production Process:
1.Stocking and supplying raw materials
2.Processing raw materials
3.Batching and pouring
4.Cutting
5.Grouping and maintaining process
6.Steaming in autoclaves
7.Final products packaging
Product Principle1) Technology OrientationProduction and application of aerated concrete has a history more than 40 years in China. Viewing from technology point, high quality products can use 3mm special sand slurry technology to meet the construction requests and 50% energy saving goals. (When mortar joint is less than 3mm, take thermal conductivity coefficient of wall as 1; when mortar joint is more than 3mm, take thermal conductivity coefficient of wall as 1.5). Based on the history of the aerated concrete development, only high quality products can bring a prosperous market. Thus, the technology orientation of this scheme is high-class products according to China Standard GB11968-2006.2) Production CapacityIn our factory, the main production capacity is annually 50,000m3, 100,000m3, 150,000m3, 200,000m3, 300,000m3 etc. The product is aerated concrete block which is light in weight. Also, there is a reservation of plate in consideration of users' need.3) Product SpecificationProducts conform to requirement of 04~07 grade blocks stated in GB11968-2006.General Specifications of Aerated Concrete Blocks
Service
1.Production Line Design. Including: drawing of plant working process , drawings of land construction, drawings of power working, drawings of driving force for working, drawings of anti-dust, drawings of water supply and drainage, and drawing of air pipeline construction.2.Technical Guidance of Building FactoryIncluding: consultation of facility, Equipment installation guide, constitution the production preparation, etc.3.Providing the technical information of setting up factoryIncluding: part of the factory management system, all posts accountability of production line, process rules, safety rules, setting a quota of staff and posts, pre-production tools directory, laboratory instruments, product catalogs, and test methods.
Contract Information: Tel: 86-519-89883750
Fax: 86-519-89883760
Mobile: 86-13775230604
Best Material Autoclave Trolley For AAC Plant